BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//GreeningDetroit.com - ECPv5.11.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:GreeningDetroit.com
X-ORIGINAL-URL:https://www.greeningdetroit.com
X-WR-CALDESC:Events for GreeningDetroit.com
BEGIN:VTIMEZONE
TZID:America/Detroit
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20170312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20171105T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20170508T080000
DTEND;TZID=America/Detroit:20170508T170000
DTSTAMP:20260519T214813
CREATED:20170505T175859Z
LAST-MODIFIED:20200125T231859Z
UID:39113-1494230400-1494262800@www.greeningdetroit.com
SUMMARY:The Zilwaukee Bridge: From the Beginning to the Present
DESCRIPTION:This presentation will highlight the initial studies into the decision on construction of a high-level bridge for I-75 over the Saginaw River\, including the various options\, and challenges at the time. Once the decision was made on the construction of the post-tensioned concrete segmental option\, there were many challenges associated with it\, considering it was Michigan’s first construction experience of its type. \nThe initial challenges in the design and construction will be chronicled\, along with the construction failure in August of 1982\, and the subsequent repairs to save the bridge. 30 years of operations will also be explored\, including the major challenges of replacing the bearings as part of the 2013-2014 project. \nESD Members: $50 per two-hour course; Free for ESD Fellows\nNon-Members: $75 per two-hour course \nEach course earns two hours of continuing education. A certificate of completion will be provided.
URL:https://www.greeningdetroit.com/event/zilwaukee-bridge-beginning-present/
CATEGORIES:Seminar
END:VEVENT
END:VCALENDAR