The goal and objective of Project X is to mitigate standing and sub-surface water and reduce the level of over saturated soft soil on an initial site on campus which spans over 260 acres, in Redmond, Washington. The average annual precipitation in Washington state is 38.15 inches so consequently Washington experiences a lot of standing and sub-surface water issues.