- Westbound lanes on Michigan Ave from Griswold to Shelby will be closed completely from now through Sept. 2016 for building renovation. However, one lane in each direction for both eastbound and westbound traffic will be open at all times, using the eastbound lanes.
- State Street (south side) from Griswold to Shelby will have a partial lane closure of eastbound lane and sidewalk from now through May 1, 2016 for building renovation.
- Shelby from State Street and alley south of State will have a partial closure of the northbound lane from now through May 1, 2016 for building renovation.
- Jefferson, Larned, E. Grand River, Times Square, St. Anne, and Lafayette will have intermittent traffic detours to perform fiber cable work from now through June 15, 2016 from 5 p.m. to 7 a.m.
- Congress from Woodward to Bates will have northern westbound lane and sidewalk closed for building renovation from now through Oct. 31, 2016.
- Woodward from Gratiot to Michigan will be closed for M-1 Rail crossover construction from now through May 21, 2016.
- Griswold from W. Grand River to John R will have northbound lane and parking lane closed from now through June 2017 for building renovation. However, one lane in each direction will be maintained.
- Cadillac Square from Woodward to Bates will have parking lanes closed from now through Oct. 29, 2016 for Food Huts Monday through Friday from 11 a.m. to 2 p.m. However, two lanes in each direction will be maintained.
- Mt. Elliott from Evaline to Mound will be closed for bridge reconstruction from now through May 16, 2016.
- East Jefferson from Beaufeit to Bellevue will be partially closed from now through May 1, 2016 for reconstruction of overpass/bridge. One westbound lane and two eastbound lanes will be open at all times.
- Warren from St Antoine to Russell will have partial closures in the two eastbound lanes for utility work from now through Apr. 15, 2016.
Click Here to be introduced to the Detroit Department of Public Works